- Densified Silica Fume
- Inpakken: In 950KG or 1000KG jumbo bags
- Lead time: Within 15 days after order confirmed
- Inpakken: In 10kg water soluble paper bag and then shrink wrap on pallet or put them into a carton box
- Lead time: Within 15 days after order confirmed
- Inpakken: In 20kg water soluble paper bag and then shrink wrap on pallet
- Lead time: Within 15 days after order confirmed
- Inpakken: In 25kg plastic woven bag and then shrink wrap on pallet
- Lead time: Within 15 days after order confirmed
- Onverdichte Silica Fume
- Inpakken: In 600KG or 500KG jumbo bags
- Lead time: Within 15 days after order confirmed
- Inpakken: In 25KG plastic woven bags shrink wrap on the pallets
- Lead time: Within 15 days after order confirmed
Opslag:
Silica fume is stored and handled similar to cement or fly ash.
Silica Fume should be stored in a dry and protected environment.